All down

All down

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
The inspection cover

The inspection cover

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 5
All down

All down

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 2
First coat of sealer

First coat of sealer

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
The fire surround after

The fire surround after

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
getting it all level

getting it all level

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
Fitting the inspection tray

Fitting the inspection tray

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
Fire surround before

Fire surround before

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
we made our own pegs for spacing

we made our own pegs for spacing

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 2
Nice and level

Nice and level

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
Sealing the floor

Sealing the floor

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
Tray just in place but not fitted as yet

Tray just in place but not fitted as yet

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
It was dark in that basement

It was dark in that basement

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
Getting the bond down

Getting the bond down

  • diamondtiling
  • Jan 24, 2010
  • 0
  • 0
D

Sandstone floor. | Tiling Advice | TilersForums.com

  • 15
  • diamondtiling
A sandstone floor fitted into a basement. The stones were 25/30mm thick and ranged from 600x600 to 1000x600. An inspection cover was incorporated into the floor. The tiles were sealed with LTP mattstone.
There are no comments to display.

Advertisement

Album information

Album owner
diamondtiling
Date created
Item count
15
View count
897
Comment count
0
Rating
0.00 star(s) 0 ratings
Top