Existing flooring including carpet, tiles, and wooden flooring was all removed and then the floor self levelled. Insulation boards were then installed followed by underfloor heating. The floor was again self levelled before the Tumbled Limestone was installed.
A lot of work went into this one but I think it was worth the effort