J joe bloggs Oct 17, 2010 Dry run of 900x1200tray fitting; PB and tiles simulated to see 3mm gap each side. It's to be pivoted on front edge and lowered into position on mortar bead. To complicate matters the difference in floor level between front and back of tray is 30mm.
Dry run of 900x1200tray fitting; PB and tiles simulated to see 3mm gap each side. It's to be pivoted on front edge and lowered into position on mortar bead. To complicate matters the difference in floor level between front and back of tray is 30mm.