J joe bloggs Oct 17, 2010 WC pan removed, soil pipe cut back, new 110mm brach fitted, 40mm solvent pipework to shower waste, HepVo valve fitted. Luckily the joists were far enough apart to get a cordless drill and hole saw in for holes.
WC pan removed, soil pipe cut back, new 110mm brach fitted, 40mm solvent pipework to shower waste, HepVo valve fitted. Luckily the joists were far enough apart to get a cordless drill and hole saw in for holes.