Hi all
Looking for some advice on the Wedi system.
I’m installing a Wedi Fundo Riolito Neo 1200 x 800mm former on a suspended timber floor (25mm ply on joists with Wedi board over rest of floor and on walls).
Looking at a number of videos on YouTube it seems in the US that the Wedi trays tend to be rebated (a “dado” as they say) along the top edge of the tray where any Wedi board meets the top of the tray. That joint is then filled with Wedi 610 and no further waterproofing of the joint (such as tape and Wedi 520) is applied.
The installation instructions for the tray I have make no mention of that approach and suggest the tape and 520 should be used for all joints.
Does anybody have any experience of this specific tray and more generally the approach you take to joint Wedi tray/board and Wedi board/board on both wall and floor?
Thanks very much
Looking for some advice on the Wedi system.
I’m installing a Wedi Fundo Riolito Neo 1200 x 800mm former on a suspended timber floor (25mm ply on joists with Wedi board over rest of floor and on walls).
Looking at a number of videos on YouTube it seems in the US that the Wedi trays tend to be rebated (a “dado” as they say) along the top edge of the tray where any Wedi board meets the top of the tray. That joint is then filled with Wedi 610 and no further waterproofing of the joint (such as tape and Wedi 520) is applied.
The installation instructions for the tray I have make no mention of that approach and suggest the tape and 520 should be used for all joints.
Does anybody have any experience of this specific tray and more generally the approach you take to joint Wedi tray/board and Wedi board/board on both wall and floor?
Thanks very much