Search results

  1. Uheat - Jake

    Decoupling membrane needed?

    Seen the mention of Primer so thought I'd leave this here, very popular product... Thermal Primer - 1 Litre (10m2) - http://www.uheat.co.uk/thermal-primer-1-litre-10m2/
  2. Uheat - Jake

    Tiling On Ufh?

    Priming can be done on the bottom side of the panel. The expansion would be tiny if anything, that information come straight from our Manufactures mouths.
  3. Uheat - Jake

    Tiling On Ufh?

    A decoupling membrane can be used and stuck down with a Flexible tile adhesive, All adhesives we recommend to be used should be Flexible. Panels need to be sprayed with the glue, left for a few minutes before being laid and then stood on for a moment, this is the only pressure they need. The...
  4. Uheat - Jake

    Tiling On Ufh?

    Hiya Ray, We have a 18mm Retrofix Heavy Panel which are made from recycled gypsum, paper and water, mixed in an 80%- 20% ratio to produce homogeneous, dense sheet material that is cured, they are pre grooved for 12mm pipe which will be spaced at 150mm. This allows tiles and engineered wood to...
  5. Uheat - Jake

    insulation boards

    Hello Mike, The XPS Insulation board is a great saver if you have a concrete base. We have the options of 6,10 & 20mm boards all which need to be stuck down with a Flexible Tile Adhesive. Our boards have a 300kpa compressive strength so there not easily damaged when tiling. The boards also...

Advertisement

Back