hi Charlie,
thanks for the advice... I will lay thin bed of screed to the former to create the 'plane' ..just a quick question..The whole floor will be mosaiced (white travantine) so do I follow the same process as for the former for the remainder of the floor just with less of a gradient...
Charlie, many thanks, your advice invaluable:smilewinkgrin: I get the planes thing..dont have a lasr yet but guess a level will b ok...any tips on setting the drain level..what would u allow for adhesive. ..? 2/3mm? And 3mm notched trowel? And use float to press in...sorry so many questions...
Thanks Bri, did not think of that, pity..mosaics it is...the floor is quite uneven ( I didn't lay it!) So screed first might be good opportunity to smooth it all out ;-)
Hi
Thanks for the reply, The waste is offset within the topp dec former so could I could not get it to match both sides, ended up with brain ache:smilewinkgrin: would that make a difference at all?
Hi All,
I was asked to fit these tiles onto the former and floor of this wetroom, being new to tiling formers I tried to work it out but always ended up with very small corners cut off...I think it would have been a knightmare, would anyone have attempted this one?
Customer is now going to...
Hi again, have got new blade for cutter and waiting for diamond hand polishing pads to arrive! My blade is 1.8 mm thick not 3 mm do you think this will cause a problem. This is the room...and the tanked floor...
these r the tiles
and size
Any advice would be great. I will dry lay first to...
That's great many thanks, will get new blade and diamond pads, any you can recommend? I will post some more when the tiles arrive so I can see what layout will be needed...again many thanks,
Lee
Hi Dan
No, they have not got the tiles yet, I said the smaller the better! They had a sample tile which was rectangular about 300mm by 150 mm . I have had a look at some envelope examples on here to try and get some idea. The waste is offset and the former is not flush to the wall. There is a...
Hi all
I have done quite a lot of tiling/ bathrooms over the years but not a wet room floor. I would very much like some advice on how to go about tiling onto the floor and topp dec former with offset waste. The floor has been lined with ply. I am thinking of using plastic ply as well before...