  1. Geoff Thacker

    First time post ....problematic sandstone floor

    What I should of asked is, I don’t know why the anti fracture mat was required is that not just doing the same job as the insulting board ... and I suppose in a way the job was problematic as it caused a slipped disc that pinched my sciatic nerve:(
  2. Geoff Thacker

    First time post ....problematic sandstone floor

    Maybe problematic was the wrong title maybe “overthought” is better apologies
  3. Geoff Thacker

    First time post ....problematic sandstone floor

    Hi , JC. The floor was previously tiled “badly” directly onto the chipboard and to be honest the tiles lifted and left the floor clean (what would indicate lack of primer) but only two small areas the tiles were cracked so we put concrete anchors in that area so I’m more the confident to...
  4. Geoff Thacker

    First time post ....problematic sandstone floor

    Hi all, iv been apart of the forum for a little while now but never posted until now. I’m Geoff and my company is GHL Bathrooms and Tiling we’ve been trading on and off (off when I was paye for a few years) for 15 ish years now around central Scotland. Thought I’d share this job to see if you...
  5. Geoff Thacker

    How long to wait until tiling onto 75mm screed

    If this was my job and time wasn't an issue I'd put a hydrometer on it to make sure the screed was dry, in my opinion a 75mm s&c screed could take up to 3 months to completely dry, if time is a issue I'd use a DPM before tiling with SPF iv used tile masters DPM in the past for this exact...
  6. Geoff Thacker

    Hi I'm new to this forum

    Hi my name's Geoff I own a small bathroom company in west lothian near Edinburgh (GHL Bathrooms And Tiling) my background is tiling but as most of you will appreciate we had to diversify into full bathroom refits and into the wetwall market also. I was part of another forum that I enjoyed...