Wondered what u guys would price for this job.
bathroom 1
7.4 m2 onto old floorboards...these need to be secured to the joists...maybe a couple replaced...in a bad way. Then room needs to be overboarded. Then tiled with pocelain 300 x 300 cuts need to be made around toilet, bday, bath, basin base.
bathroom 2
1.94 m2 same as above but only needs cuts round basin base.
Thanks
Wondered what u guys would price for this job.
bathroom 1
7.4 m2 onto old floorboards...these need to be secured to the joists...maybe a couple replaced...in a bad way. Then room needs to be overboarded. Then tiled with pocelain 300 x 300 cuts need to be made around toilet, bday, bath, basin base.
bathroom 2
1.94 m2 same as above but only needs cuts round basin base.