Iain Crosbie
Hi folks
My Spanish house has a bath installed and I really need to have a shower instead as there are disabled family members.
The concrete floor is a bison beam with a screed over the top. Walls are typically spanish rubbish brick acting as infil only as structure is in the re-inforced post and floor construction.
My question is
What level of tanking would I need before forming a tray with the appropriate falls on top of the existing concrete floor out of SLC.
I hoped to use a brush on tanking product but perhaps you could advise me on this.
thanks in advance
Iain
My Spanish house has a bath installed and I really need to have a shower instead as there are disabled family members.
The concrete floor is a bison beam with a screed over the top. Walls are typically spanish rubbish brick acting as infil only as structure is in the re-inforced post and floor construction.
My question is
What level of tanking would I need before forming a tray with the appropriate falls on top of the existing concrete floor out of SLC.
I hoped to use a brush on tanking product but perhaps you could advise me on this.
thanks in advance
Iain