trying to put right a wet room a previous tiler had installed ,that when i stripped it back i found that the floor hadnt been tanked,if you can beleive that.the existing tiles have been fixed on green chipboard so they hadnt stuck ,thus the tiles had popped.
i need to over board, so shower tray former needs to be raised,i was going to fix 6mm hardi ,then tank with wb1 or equivalent, bottom row of tiles off tape to wall and floors ect question is do ineed to prime hardi before tanking, and will this suffice, or any other alternatives ? ufh as well
thanks in advance
i need to over board, so shower tray former needs to be raised,i was going to fix 6mm hardi ,then tank with wb1 or equivalent, bottom row of tiles off tape to wall and floors ect question is do ineed to prime hardi before tanking, and will this suffice, or any other alternatives ? ufh as well
thanks in advance