Y
yzyz
Hi,
I am a first time DIYer and I think I've just made a terrible mistake.
The bathtub in our family bathroom is surrounded by three walls, two 0.7m and one 1.7m. They are tiled half way up. We want to tile them to the full height so we or our guests can occasionally shower in it. The tiles we are using are ceramic, 20X33cm with a 9mm thickness.
The upper half of the walls were painted, so we tried to remove the paint as it doesn't seem solid enough. When doing that, we wettened the paint, which removed some paint and revealed some paper underneath. We then decided to remove all the paper because we didn't believe tiles can be attached to paper, and finished that in a few hours. Now the walls are barely the core of the plasterboard. On the 0.7m walls the gypsum is grey and can resolve when wettened, the 1.7m wall is white, and seems stronger.
After some googling we realised how important the paper layer is to the plasterboard, and how wrong it is to have removed all the paper. In most cases people's advice is the plasterboard should be replaced if the paper is damaged (leaving along completely removed). However as we want to keep the existing tiles, we are not sure if replacing the plasterboard is possible. Plus the bathtub/shower will not actually be used very much, and now we only what the bathroom to look nice. This may sound silly, but we actually plan to primer the wall with Bal APD, then tile with Bal Whitestar. Would this be ok?
Many thanks for any advice. We know we've messed up but this is probably the price we need to pay for learning DIY.
YZ
I am a first time DIYer and I think I've just made a terrible mistake.
The bathtub in our family bathroom is surrounded by three walls, two 0.7m and one 1.7m. They are tiled half way up. We want to tile them to the full height so we or our guests can occasionally shower in it. The tiles we are using are ceramic, 20X33cm with a 9mm thickness.
The upper half of the walls were painted, so we tried to remove the paint as it doesn't seem solid enough. When doing that, we wettened the paint, which removed some paint and revealed some paper underneath. We then decided to remove all the paper because we didn't believe tiles can be attached to paper, and finished that in a few hours. Now the walls are barely the core of the plasterboard. On the 0.7m walls the gypsum is grey and can resolve when wettened, the 1.7m wall is white, and seems stronger.
After some googling we realised how important the paper layer is to the plasterboard, and how wrong it is to have removed all the paper. In most cases people's advice is the plasterboard should be replaced if the paper is damaged (leaving along completely removed). However as we want to keep the existing tiles, we are not sure if replacing the plasterboard is possible. Plus the bathtub/shower will not actually be used very much, and now we only what the bathroom to look nice. This may sound silly, but we actually plan to primer the wall with Bal APD, then tile with Bal Whitestar. Would this be ok?
Many thanks for any advice. We know we've messed up but this is probably the price we need to pay for learning DIY.
YZ