R
Rich Midge
I posted a couple of weeks back about a job for my neighbours who were getting consistently done over by Topps. Job is now 99% complete and the arguments have begun! Basically I sent them my estimate to lay the floor at a reduced rate which I actually pointed out to them (thought they might like to know they were getting a bargain). Whilst there, I've needed to supply and lay SLC, supply extra addy, cut down and fit the kitchen plinths and 2 doors, make a new timber threshold, supply trims for a bit of wall tiling they wanted doing, move a marble table twice, disconnect and reconnect washing machine, dishwasher, and American fridge freezer and dismantle then rebuild the back gate so the massive fridge could be delivered into the house. Guess what?...............yep, you got it. They only want to pay me my original estimate for laying the floor. 45 minutes on the phone this evening would have been better spent banging my head against the wall. Soz for the rant, needed to vent!