Hi,
I'm looking for advice on fixing some hardibacker board onto the floor of a shower cubicle. The hardibacker board is being installed to give an added layer of protection to the particle board subfloor. A steel shower tray with frame and feet will then sit on the backer board.
The particle board subfloor has been painted with eggshell paint, what I want to find is what treatment / priming is necessary before fixing the layer of backer board using BAL flexible adhesive?
Thanks
I'm looking for advice on fixing some hardibacker board onto the floor of a shower cubicle. The hardibacker board is being installed to give an added layer of protection to the particle board subfloor. A steel shower tray with frame and feet will then sit on the backer board.
The particle board subfloor has been painted with eggshell paint, what I want to find is what treatment / priming is necessary before fixing the layer of backer board using BAL flexible adhesive?