Hello
I'm new to this forum and would appreciate some friendly and sensible advice.
I generally do small plumbing jobs but I've got the chance to do a full bathroom refurb. This will include removal of wall tiles and old lino flooring and replacement with wall and floor tiles. The toilet, bath, basin etc will be replaced. The bathroom is fairly small- 1500wx2500lx2200h. The property will be occupied while the work is carried out and the client insists on the toilet being operational as far as possible.
I'm trying to work out a programme for the floor and wall tiling bearing in mind in particular the toilet requirement.
Would it be better to place the new toilet pan onto the new floor tiles?
Cheers
rsr
I'm new to this forum and would appreciate some friendly and sensible advice.
I generally do small plumbing jobs but I've got the chance to do a full bathroom refurb. This will include removal of wall tiles and old lino flooring and replacement with wall and floor tiles. The toilet, bath, basin etc will be replaced. The bathroom is fairly small- 1500wx2500lx2200h. The property will be occupied while the work is carried out and the client insists on the toilet being operational as far as possible.
I'm trying to work out a programme for the floor and wall tiling bearing in mind in particular the toilet requirement.
Would it be better to place the new toilet pan onto the new floor tiles?
Cheers
rsr