K
kaharrison9
Here is another mosaic job that i tiled next after the mosaic bathroom Rob put up yesterday.
Rob did a cracking job prepping,fitting the wet tray,tanking,etc.
All fully epoxied.
Could do we going back and taking some better photos of it know it is completed.
Tedious work cutting the mosaics around the LED lights.
The curved wall had to be abosolutley perfectly so the mosaics did not start twisting as they came round the tightest part of the curve
The last photo is of a contraption i made to bend the trims at the top and it worked fabulous.
Kev
Rob did a cracking job prepping,fitting the wet tray,tanking,etc.
All fully epoxied.
Could do we going back and taking some better photos of it know it is completed.
Tedious work cutting the mosaics around the LED lights.
The curved wall had to be abosolutley perfectly so the mosaics did not start twisting as they came round the tightest part of the curve
The last photo is of a contraption i made to bend the trims at the top and it worked fabulous.
Kev