P
pilsburypie
Hi all.
Let me explain the situation. Previous job bodged by builder. He has agreed to pay for the whole job to be removed and totally redone. (Thanks Dominic Diamond Tiling for your report).
The builder has asked for 3 quotes.
Neil from NP Tiling has quoted for me (cheers Neil) and I have got one other quote from a local tiler.
So I am after one further quote to remove bathroom suite, rip off old tiles wall and floor, take up floor and prep properly with 18mm WBP and hardiebacker, tile the floor and half walls then put suite back in. I understand you will require a plumber for the removal and refit of the suite - I am happy for you to arrange if you know one or I can arrange my own.
Help appreciated for a start hopefully in a few weeks.
Mark
Let me explain the situation. Previous job bodged by builder. He has agreed to pay for the whole job to be removed and totally redone. (Thanks Dominic Diamond Tiling for your report).
The builder has asked for 3 quotes.
Neil from NP Tiling has quoted for me (cheers Neil) and I have got one other quote from a local tiler.
So I am after one further quote to remove bathroom suite, rip off old tiles wall and floor, take up floor and prep properly with 18mm WBP and hardiebacker, tile the floor and half walls then put suite back in. I understand you will require a plumber for the removal and refit of the suite - I am happy for you to arrange if you know one or I can arrange my own.
Help appreciated for a start hopefully in a few weeks.
Mark