A
andytraineetile
can anyone help im about to tile my 1st bathroom and i have a problem ther is a 4 inch hole from the top of the bath up 2 the ceiling with pipes running all the way through this gap! also ther is a 6 inch by 6 inch gap wer the old shower used 2 be and wondered how is best to cover these up before tiling? finally ther as just been a new shower fitted and wonderd how would be best to work around this?