Hi,
I'm gutting a bathroom I'm going to tile.
I was planning on dotting and dabbing the brick walls after I ripped off the old tiles. The tiles were only part of the way up the wall.
After Stripping the tiles (which were on 1" chipboard) I am left with around a 20 - 30mm step.
Whats the best course of action? I'm now thinking I'll batten the brick below then screw the plasterboard direct to both?
Removing the plaster above will be too much grief (dust & time)
Any advice gents?
ps - I'm tanking round the over bath shower :smilewinkgrin:
cheers
I'm gutting a bathroom I'm going to tile.
I was planning on dotting and dabbing the brick walls after I ripped off the old tiles. The tiles were only part of the way up the wall.
After Stripping the tiles (which were on 1" chipboard) I am left with around a 20 - 30mm step.
Whats the best course of action? I'm now thinking I'll batten the brick below then screw the plasterboard direct to both?
Removing the plaster above will be too much grief (dust & time)
Any advice gents?
ps - I'm tanking round the over bath shower :smilewinkgrin:
cheers