Today I decided to use standard set addy on a floor.. I ALWAYS use rapid on floors, but decided, as this floor is all over the shop, that I'd give myself a bit more leeway on times etc...
Left the job this evening a little fed up with how long it's taking to get down, but happy with the work. Everything nice and flat, not even a mm lippage anywhere.
So, I'm sitting in the bath mulling the job over (as you do), thinking what a pain it is, and how it's a good job I used standard set......... Oh... My... God!!! I wasn't using rapid! Before I left, I walked over a section of the floor that'd been down 4 hours, and didn't give it a second though!?! Until now!!
What a clown!
I have a sneaking suspicion that I'll be pulling up a couple of metres on Monday
Left the job this evening a little fed up with how long it's taking to get down, but happy with the work. Everything nice and flat, not even a mm lippage anywhere.
So, I'm sitting in the bath mulling the job over (as you do), thinking what a pain it is, and how it's a good job I used standard set......... Oh... My... God!!! I wasn't using rapid! Before I left, I walked over a section of the floor that'd been down 4 hours, and didn't give it a second though!?! Until now!!
What a clown!
I have a sneaking suspicion that I'll be pulling up a couple of metres on Monday