A
adros88
Hi. I have a sand and cement screed (75mm deep) with wet underfloor heating installed. The screed will be 5 weeks old when tiles are planned to go down. The underfloor heating will have been run up to temp and down over the 5th week. I'm currently getting quotes to tile it. I've read that a de-coupling mat should be used but as with most things in life everyone seems to have different opinions :lol: We have chosen a modular porcelin tile. The only thing that is agreed on is that the screed isn't a great level so they all want to latex it first. As the rest of the downstairs is being latexed due to a poor original screed it's no big deal to get the kitchen done at the same time.
Any advice on drying times and the use of a matting would be really helpful.
Many thanks
Any advice on drying times and the use of a matting would be really helpful.
Many thanks