monty
I've just been on my leaflet dropping duties again for a few hours and was shouted back by a man just in the middle of doing his on-suite bathroom.
He said "Can you give me a price just for the labour as i'm getting the materials from b&q"
He his plying the floor, plastering the walls and the room is roughly 2 mts x 1.5 mtrs...He wants the floor doing and the wall tiles doing to to the ceiling both out of ceramics, theres a bath sink and a window.
I told him i would come back around to measure up proper at 7.30 he said "thats fine"
Should i advice him not to use b & q adhesive and grout and i can get him BAL at trade prices??
When i get there and measured up should i charge by the metre or by day rate? How long should this take and how much should i estimate??
Thanks
----
Come on lads i've only got a hour and half to go for my first estimates and i'm bricking myself!!!
Tell me all the do's and don'ts on your first estimate
Cheers
He said "Can you give me a price just for the labour as i'm getting the materials from b&q"
He his plying the floor, plastering the walls and the room is roughly 2 mts x 1.5 mtrs...He wants the floor doing and the wall tiles doing to to the ceiling both out of ceramics, theres a bath sink and a window.
I told him i would come back around to measure up proper at 7.30 he said "thats fine"
Should i advice him not to use b & q adhesive and grout and i can get him BAL at trade prices??
When i get there and measured up should i charge by the metre or by day rate? How long should this take and how much should i estimate??
Thanks
----
Come on lads i've only got a hour and half to go for my first estimates and i'm bricking myself!!!
Tell me all the do's and don'ts on your first estimate
Cheers