B
B33fy
Having had useful info on a previous question I'm back, since removing the wall between two rooms I have a strip in the floor where the wall was through which runs a plastic DPC strip and the wavy edges of the damp proof membranes, this area is about 10mm lower than the floor levels each side, I tried filling with cement but the DPM's were trapping air and springing up through the cement, all a bit of a mess.
Any ideas as to what could be used the bridge the gap before laying tiles?
Thanks
Any ideas as to what could be used the bridge the gap before laying tiles?
Thanks