Hi, I've not progressed my wet room as envisaged but some 1 year later are about to make a start again.
Final check please can someone confirm the following order of work for me?
1. Impey Aqua Dec former installed - I got this far!
2. Give key to floor and walls.
3. Using Durabase strips seal joints between floor and wall and anywhere pipes come out?
4. Using suitable adhesive (some Mapei stuff) fit Durabase WP to wall overlapping by say 6 inch to floor?
5. Using same adhesive install Durabase C1 across floor area?
6. Lay Elektra heating mat in same adhesive ON TOP OF Durabse C1?
7. Install tiles over wall tanking and heating mat using same adhesive?
8. Grout all tiles?
9. Seal?
I want to do this myself but there is a certain nervousness about getting it wrong!
Any advice greatly recevied.
Thanks
Final check please can someone confirm the following order of work for me?
1. Impey Aqua Dec former installed - I got this far!
2. Give key to floor and walls.
3. Using Durabase strips seal joints between floor and wall and anywhere pipes come out?
4. Using suitable adhesive (some Mapei stuff) fit Durabase WP to wall overlapping by say 6 inch to floor?
5. Using same adhesive install Durabase C1 across floor area?
6. Lay Elektra heating mat in same adhesive ON TOP OF Durabse C1?
7. Install tiles over wall tanking and heating mat using same adhesive?
8. Grout all tiles?
9. Seal?
I want to do this myself but there is a certain nervousness about getting it wrong!
Any advice greatly recevied.
Thanks