J
jond500
Hi All,
Sorry for the slow updates but the job has taken much longer than planned. Many thanks for the help and advice over the months which has been very very much appreciated
The floor was originally chipboard, this was overlaid with 6mm Hardibacker, screwed and bonded with their glue. It then had 10mm Warmup insulation board fixed with Tilemaster Rapid Set Flexible, then the UFH, then SLC and finally the tiles which are 450mm square.
Anyway, here are a couple of pics:
The setting out may look weird but the first grout line to the right aligns with the centre of the toilet base, the chrome buttons on top and also follows the bond of the wall tiles.
Cheers,
Jon.
Sorry for the slow updates but the job has taken much longer than planned. Many thanks for the help and advice over the months which has been very very much appreciated
The floor was originally chipboard, this was overlaid with 6mm Hardibacker, screwed and bonded with their glue. It then had 10mm Warmup insulation board fixed with Tilemaster Rapid Set Flexible, then the UFH, then SLC and finally the tiles which are 450mm square.
Anyway, here are a couple of pics:
The setting out may look weird but the first grout line to the right aligns with the centre of the toilet base, the chrome buttons on top and also follows the bond of the wall tiles.
Cheers,
Jon.