Hi Guy's,
Saturday will be my first time laying Hardie boards. Hardie 250 boards are going down onto an 18mm ply, level and deflection free floor (level to within 1/8" across any span). I gather the recommended method is SPF with 6mm notched trowel. This part is going to sound like a silly question but here we go. Hardie will be fixed with turbogold screws, but when do you put these in ? I assume that you lay the boards to the SPF base and let that go off when the boards are bedded and leveled and come back a little later to put the screwes through to secure it all down to avoid the screws diggingon side of the board deeper into the bed than the other. Please confirm.
Also whats your method to ensure they are bedded down. Position, wiggle and check with large level, lay next board and do the same ensuring level with the first board down. Drop it down, couple of taps with a hide mallet ??
Sorry if it sounds silly and basic but want to check i'm using the right methodology.
Thanks
Martin.
Saturday will be my first time laying Hardie boards. Hardie 250 boards are going down onto an 18mm ply, level and deflection free floor (level to within 1/8" across any span). I gather the recommended method is SPF with 6mm notched trowel. This part is going to sound like a silly question but here we go. Hardie will be fixed with turbogold screws, but when do you put these in ? I assume that you lay the boards to the SPF base and let that go off when the boards are bedded and leveled and come back a little later to put the screwes through to secure it all down to avoid the screws diggingon side of the board deeper into the bed than the other. Please confirm.
Also whats your method to ensure they are bedded down. Position, wiggle and check with large level, lay next board and do the same ensuring level with the first board down. Drop it down, couple of taps with a hide mallet ??
Sorry if it sounds silly and basic but want to check i'm using the right methodology.
Thanks
Martin.