Hi
I am gping to be tiling a large ground floor flat through out
The passage is floorboard and rest of house is screeded however the screed needs levelled what would be best way to prep floor as floor transitions from floorbard to screed.
Is 6mm hardiebacker screwed into floor boards then self level to that depth where it goes thru threshold into kitchen diner best way or is there a better way ?????
I am gping to be tiling a large ground floor flat through out
The passage is floorboard and rest of house is screeded however the screed needs levelled what would be best way to prep floor as floor transitions from floorbard to screed.
Is 6mm hardiebacker screwed into floor boards then self level to that depth where it goes thru threshold into kitchen diner best way or is there a better way ?????