T
Tony B
Hello all
I have had to use about 50 bags of PCI Floorfast 20 rapid on 2 jobs for a fast food chain because of the spec(i normaly use Mapei) and ive had nothing but trouble on the 2 sites, the tilers on site are telling me it is taking at least 7 hours to dry .. Has anyone else had the same problem?
PS the use by date is fine ....Thanks
I have had to use about 50 bags of PCI Floorfast 20 rapid on 2 jobs for a fast food chain because of the spec(i normaly use Mapei) and ive had nothing but trouble on the 2 sites, the tilers on site are telling me it is taking at least 7 hours to dry .. Has anyone else had the same problem?
PS the use by date is fine ....Thanks