A
atec
Hi all, im new to the forum Arms.
Lately been getting knocked back on my quotes, last 3 to be exact. Bit disapointed on the last one as i feel i did quote low to Get the work. It was a shower cubicle,6m2, it was alraedy tiled and damp damage. the client was aware of this and explained do what is needed to sort it. I inturn explained to him the tiles need removed, the plaster board removed and replaced with backer board, joints tanked, the shower tray and cubicle refitted. I quoted 120 for the tiling and 120 for the prep and repair, 240 total, he was happy as lowry, but later informed me he got a better quote. is my quote to high
Lately been getting knocked back on my quotes, last 3 to be exact. Bit disapointed on the last one as i feel i did quote low to Get the work. It was a shower cubicle,6m2, it was alraedy tiled and damp damage. the client was aware of this and explained do what is needed to sort it. I inturn explained to him the tiles need removed, the plaster board removed and replaced with backer board, joints tanked, the shower tray and cubicle refitted. I quoted 120 for the tiling and 120 for the prep and repair, 240 total, he was happy as lowry, but later informed me he got a better quote. is my quote to high