A
americasmiles
Hi having work done on the house at mo - new floor being laid - top levels being styrofoam, underfloor heating, screed. I am doing whatever I can myself and shoot me down in flames but tiling has to fall into that category. What I am unclear about is whether I need a decoupling membrane? Total area is around 27m not sure if that is a large space or not. The other issue is how long should I wait before tiling and although I wince at the price of the membrane - will it enble us to tile more quickly. Do I really need to wait 2-3 months before tiling?