A
andyg
greetings to all from sunny tenerife. i am starting a job tiling a 50m2 sun terrace soon. the clients builder has laid the base for me to tile ,the problem is in one corner he laid a level area area of 2.5m2 ready for a hot tub to sit on. he has then ran a severe slope on two sides for any water spillage to drain away from the building. i knoe i could run tiles at the corner at 45degree cuts but the client woht have this if i lay them square they dont sit right .does anybody have any suggestions.