N
newreno
Thanks to some great help from this forum I've managed to finish tiling the walls in my bathroom. Really satisfying feeling and I'm pleased with the result. Just the grouting, siliconing and the floor to do now.
We had plumbers come in and take the sink and toilet off the walls so that I could tile behind them. They're coming back on Tuesday to replace both. The tiles are big so there are no joins that need grouting behind the sink, but there are some joins behind the toilet. It's a hanging toilet and I've cut neatly around the outlet etc. When the toilet's on the wall it'll cover some of these joins. Do they need to grouted before the toilet goes back in or can they just be left? I'd then grout up to the toilet edge when I do the grouting, but there'd never be any grout behind the 'hanging' part of the toilet.
I'd like to leave the grouting until the end if possible and do it all in one day...
We had plumbers come in and take the sink and toilet off the walls so that I could tile behind them. They're coming back on Tuesday to replace both. The tiles are big so there are no joins that need grouting behind the sink, but there are some joins behind the toilet. It's a hanging toilet and I've cut neatly around the outlet etc. When the toilet's on the wall it'll cover some of these joins. Do they need to grouted before the toilet goes back in or can they just be left? I'd then grout up to the toilet edge when I do the grouting, but there'd never be any grout behind the 'hanging' part of the toilet.
I'd like to leave the grouting until the end if possible and do it all in one day...