S
Sanke
Hi all
i was called to investigate a leak from under a shower tray. To investigate meant removing the tiles from edge of tray fixing the leak & then reinstalling tray. The gap left was only 50mm so we used a mosaic ( couldn't match existing tiles ) The tiles were left for 20 (instructions were for 16 hrs ) hours before grouting & then 24 hours before trying shower. It leaked :mad2: Returned the following day & grout was still wet & watery. Cleaned away what I could & then repeated process & it has leaked again. Have I done something wrong ? Anything else I can do short of rip out all tiles behind cubicle & start again ?
i was called to investigate a leak from under a shower tray. To investigate meant removing the tiles from edge of tray fixing the leak & then reinstalling tray. The gap left was only 50mm so we used a mosaic ( couldn't match existing tiles ) The tiles were left for 20 (instructions were for 16 hrs ) hours before grouting & then 24 hours before trying shower. It leaked :mad2: Returned the following day & grout was still wet & watery. Cleaned away what I could & then repeated process & it has leaked again. Have I done something wrong ? Anything else I can do short of rip out all tiles behind cubicle & start again ?