I have, I was only planning on getting a floor prepped for next week. I have had to remove 36m2 of Dorset Stone pinhead tiles due to water damage. Gotta replace them next week. So I thought if I could lift them all and clean the floor off ready for a start on Monday it would be good. I ended up tiling about 8m2 too and removed most of the old tiles into the skip.
That means if all goes well next week I will be a day ahead of what I anticipated.
I have never known tiles come up so easy, I was just pushing a scraper along the floor and they all lifted clean. Dont you just love these days !