S
SOTON STEVE
Hi guys
As a newbie I am going to ask what many may think is an easy problem to solve, but, I'm asking it anyway!
I have just got my first job - Concrete floor unlevel in places, with lino and lino underlay stuck down fast. The customer would like 60x40 travertine with elec undertile heating. I feel I have a couple of options - take up the lino (this may take a whole day) and then self level the floor, or, leave lino down and use hardibacker. The lino is stuck very fast.
Which way would be best or any ideas I havent thought of would be a great help.
Help!!
Steve
As a newbie I am going to ask what many may think is an easy problem to solve, but, I'm asking it anyway!
I have just got my first job - Concrete floor unlevel in places, with lino and lino underlay stuck down fast. The customer would like 60x40 travertine with elec undertile heating. I feel I have a couple of options - take up the lino (this may take a whole day) and then self level the floor, or, leave lino down and use hardibacker. The lino is stuck very fast.
Which way would be best or any ideas I havent thought of would be a great help.
Help!!
Steve