Guys and Girls,
If you get anyone wanting a limestone floor fixing (approx 60m2) on underfloor heating, and finishing off other tiling works in Ayston, Leics, PM me and I can give you details. To cut a long story short, they change their minds a lot, creating extra work and unnecessary delays, then don't want to pay you for doing a 1st class job. My builder is now owed around £5000, and he's a top bloke and v good quality. Arse!:incazzato:, this was going to be my entry for JOTM as well:mad2:.
If you get anyone wanting a limestone floor fixing (approx 60m2) on underfloor heating, and finishing off other tiling works in Ayston, Leics, PM me and I can give you details. To cut a long story short, they change their minds a lot, creating extra work and unnecessary delays, then don't want to pay you for doing a 1st class job. My builder is now owed around £5000, and he's a top bloke and v good quality. Arse!:incazzato:, this was going to be my entry for JOTM as well:mad2:.