Here is the job:
slc over heat mat to a depth of 6mm (10 m2) Then tiling this floor and 1 wall, total (15m2) the tile is polished porc, its going in on diamond instead of straight! 6 holes to be drilled and there going to be a wetroom former installed by builder. Just labour only for tiling, slc, and prep work ...sealing tiles , no materials. Its one of those jobs where its going to require a real high end finish! The customer has said this.
thanks..
slc over heat mat to a depth of 6mm (10 m2) Then tiling this floor and 1 wall, total (15m2) the tile is polished porc, its going in on diamond instead of straight! 6 holes to be drilled and there going to be a wetroom former installed by builder. Just labour only for tiling, slc, and prep work ...sealing tiles , no materials. Its one of those jobs where its going to require a real high end finish! The customer has said this.