R
Reluctant Robin
My brother who is a retired joiner, with a little tiling experience, and myself who doesn't have any, are intending to create a wet room type ( with screen) bathroom. I think I may end up with lots of questions, but the main one at the moment is, what is the best method of making up the difference of 18mm ply, with 6mm backing board and then under floor heating, to a 26mm former which has to be bedded in with tile adhesive. As I want the heating mat , or Wire, I haven't decided which one yet, to be laid over the shower former as well as the rest of the floor I imagine that is essential that the whole lot is level before tiling, so how best to achieve this please??