- 1
- 513
Finished my en-suite on Xmas Eve, (must try to download pics), how long does everyone recommend before using, I normally say 2 weeks but now it's my own, I'm dying to use it. Any input?
follow_along_with_video_below_to_see_how_to_install_our_site_as_web_app
Note: this_feature_currently_may_not_be_available_in_some_browsers
Discuss How long after grouting should you wait to use a new shower in the UK Tiling Forum area at TilersForums.com.
Its recommended 14 days but I suspect they jump in when I'm at the bottom of the lane!
i can remember, finishing an outdoor pool,i was grouting the floor up the slope and out ,the peeps i was working for were so interested in getting there stage payment that by the time i was halfway up the slope they had the hose in filling, so the water was chasing me out of the pool, how mad is that!!!:lol: good job it was a red hot day!!!
i can remember, finishing an outdoor pool,i was grouting the floor up the slope and out ,the peeps i was working for were so interested in getting there stage payment that by the time i was halfway up the slope they had the hose in filling, so the water was chasing me out of the pool, how mad is that!!! good job it was a red hot day!!!
sorry Brian, as Diamond says, it's in my albums until i can attach to post. cheers:mad2:obviously must be at my end if Dom can see them.
Reply to How long after grouting should you wait to use a new shower in the UK Tiling Forum area at TilersForums.com
You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.