just on a job at the minute, wet room tray has been installed ,but flor is about 10mm out of whack, joint between wall and floor has got to be 90 degrees for glass,im gunna have to level the floor with slc, but its specified as impey membrane, can i just wait for the slc to dry out then prime with the primer provided, then stick the membrane down,