M
macken
hi everyone.
i need help to decide whether to do this job or walk away.
customer has 150m2 of floor with underfloor heating.(water)
it has 150mm of insulation and a sand and cement screed of 75mm.
screed already has hairline cracks and the heating has not been turned on yet.
customer is prepared to pay for dittra matting.
60 x 60 porc will be the tiles if tiled.
im not happy with screed, feels like its bouncing on all that insulation.
thanks.
i need help to decide whether to do this job or walk away.
customer has 150m2 of floor with underfloor heating.(water)
it has 150mm of insulation and a sand and cement screed of 75mm.
screed already has hairline cracks and the heating has not been turned on yet.
customer is prepared to pay for dittra matting.
60 x 60 porc will be the tiles if tiled.
im not happy with screed, feels like its bouncing on all that insulation.
thanks.