Looking at a job wher the spec is 45-50mm screed laid over existing concrete base .
two large areas .
the reflecta panel which is 13mm thick has an aluminium face on which t2reflecta -p-fix primer is applied before any flex adhesive can apparently be used to fix 20 mm limestone on top .
the reflecta panel is glued to the screed with a raychem adhesive.
The t2 red cable Is electric and clips in to the grooves in the insulation board.
has anyone used this system before ?
bit similar to the polypipe over lay except using electric heat wire rather than water pipes as in poly pipe system.
with polypipe the only guaranteed method I know is to glue and screw 6 mm hardie backer or similar on top of insulation.
any info or experience of fixing on this raychem system appreciated
two large areas .
the reflecta panel which is 13mm thick has an aluminium face on which t2reflecta -p-fix primer is applied before any flex adhesive can apparently be used to fix 20 mm limestone on top .
the reflecta panel is glued to the screed with a raychem adhesive.
The t2 red cable Is electric and clips in to the grooves in the insulation board.
has anyone used this system before ?
bit similar to the polypipe over lay except using electric heat wire rather than water pipes as in poly pipe system.
with polypipe the only guaranteed method I know is to glue and screw 6 mm hardie backer or similar on top of insulation.
any info or experience of fixing on this raychem system appreciated