S
Shaun77
Hi, I am tiling my hall, I have plated the floorboards with ply and screwed down every 6 inches and I plan to seal with pva ( as adhesive prep instructs). Having checked the level and it runs out aprox 1/4 of an inch into one corner, should I worry about levelling the ply with a self levelling compound first to allow for the 1/4 inch or just lay tiles as the floor is? And cut the front door to follow the tiles? Any feedback would be greatly appreciated.
Thanks in advance.
Thanks in advance.