I am finally getting round to doing my bathroom and en suite, i am considering doing the work myself as i am struggling to find someone decent to do the job- i either get people quoting £400 a day or sensible rates but a lack of trust, i am a paver and have done lots of stone work over the years so maybe i find it hard to trust people as i know i,m fussy...

Anyway one guy who i may use i am still a little unsure on though, i,d like to know whats the correct procedures for limestone tiles 600x400 - not sure on exact stone as yet but i want something very plain and white.

so....

floor: is currently chipboard= is a 12mm layer of hardibacker ok? does it need to be screwed and stuck? if so what adhesive? (no ufh)

walls: aquapanel on bath wall and shower wall, hardibacker the rest? do the joints need taping and jointing?

12mm notched trowel?

backbutter the tiles? why do people recomend this?

tiles will be honed tiles- how are the cut edges made into the same finish? what machine to use?

r.e sealing the stone: i guess i would seal first and seal after grout, but what sealer to retain the natural finish and do the backs need sealing, sure i saw that mentioned somewhere.

what adhesive?

One of the walls is concrete block- whats the best way to address this? i thought maybe dot and dab hardibacker board to get the wall flat and then plug and screw.

which grout? i want the joints flush with no recess if that makes a difference.

Oh and if anyone is in essex and can recomend please pm me. each room is about 20m2 and imo quite straightforward. I am very happy to pay a generous sensible tradesmans rate! but dont want to hear that is £400 a day or £150 a day and it will take 10 days.

am i right in thinking this would be 3-5 days work for a pro?

sorry for the huge post and thanks in advance :thumbsup:
 
D

david campbell

for an experienced tiler that should be bout 4/5 days work,it will be slower than ceramics and porcelain due to all the sealing and everything must be wet cut.i'm sure someone will get to you shortly

the back-buttering is to ensure better coverage of adhesive on the tile due to the size and weight of them:thumbsup:
 

kilty55

TF
Arms
10
1,113
edinburgh
hi williams, you cant dot and dab hardiboards but you can screw and plug them on, make sure your adhesive is white and cement based flexi

seal before and after grouting..some limestones take a good few coats
if fixing cement boards to the floors use 6mm boards on a bed of flexi cement based addy and screwed as well on top of this.

backbuttering gives better coverage with large format tiles
if you are after the egges to be bullnosed or honed finished in the bathroom this may incur an extra charge with most fixers as well as a sq meterage rate or day rate for the job

personally id opt for limestone grout

if using stone i would also condider tanking th wet areas first also,

cant give you prices on here but i would say that job would take most tilers in the region of 4 to 5 days for a good quality finish with finished edges etc as well
 
G

grumpygrouter

think its 2 grumpy,a bathroom and an en suite
Ok cheers. Maybe 4 days would be pushing it a bit for limestone then with all the work involved with sealing etc? I haven't fixed limestone yet but was under the impression it attracts fingerprints and stains like no other stone and needs to be sealed before anything else is done to it. Is that right?
 
W

williams

Thanks for the help.

Yes its 2 seperate rooms, the bathroom is about 20m2 inc the floor and bath panel and the en suite is 18m2 inc floor, the bathroom is a rectangle 2.5mx1.7m and the ensuite is a little more involved due to shower recess and a sort of extra rectangle upon entering the main area iykwim.

r.e the dot and dab for the hardibacker i only thought that i would dot and dab and then plug and screw in order to try and make the laying surface perfect, if its just plugged and screwed will the wall not potentially have a couple of humps in it? when i say dot and dab i don't mean a couple of dabs i mean maybe 25 dabs per board, the guy who did my plastering in the other rooms dot and dabbed like this and its ridiculously strong.

what machine do i need to polish the edges.

am i right in thinking the whole tile (front and back) need sealing first so as to stop any staining?


i also am able to get 900x600x 15mm limestone but part of me worries that it will be awkward, part of me thinks it will be easy though as theres so many less tiles to lay.

unless i get someone to do the job soon i,ll have to give it a go. i,m pretty confident but still a little wary. i have laid patios with all sorts of stone and driveways with 100mm granite setts in random lengths and widths but going vertical is something alien to me :yikes:
 
Last edited by a moderator:
D

DHTiling

You can't tile those 2 rooms in 4 to 5 days doing it right..

Limestone especially the whiter limestones are not as straight forward as say a travertine.. They are susceptible to staining easily if not handled properly or sealed correctly.

You need to work very clean and they can take upto several coats of sealer..

So IMO you cannot do it in that time scale with the amount of work involved.


Williams.. Fixing tiles is a total different ball game to patios or laying sets.. You need zero lippage on that type of stone as shadow lipping looks horrible.

You will not get a true stone fixer for peanuts...:thumbsup:
 
W

williams

I meant 4-5 days per job :santa_wink: i believe thats being generous and allows for a good job to be done- i,m literally talking fixing too, i will seal the stone, board the walls out (they will be bang on) floor prepped etc. i cant really see how it could be more that 4 days, but i am understanding and i know the crack.

I know what sort of money i,m prepared to pay and i think its very fair. £400 a day is a joke though, we are in recession and MOST trades have been affected, i have had to drop my rates quite a bit, it makes no difference if i do a good job which i do when theres 20 morons quoting the same job for half the price albeit its half the job but the general public conveniently forget that when the prices come in- money gets the better of most people and most people want to pay nothing! Its hard out there in my game believe me! But thats a totally different subject :incazzato:

I,m in Essex btw near chelmsford.

Lipping does worry me i assure you i am aware of that :thumbsdown:
 
W

williams

btw this is me
www.williamspaving.co.uk

any questions on paving i will gladly answer :thumbsup:

I have turned my hand to everthing in my house so far only leaving the plastering to someone else and some of the electrics so i can turn my hand, i just take my time and research as much as possible.

However i would rather pay someone to do the job as

A. i know it will come out better (if hes a good tradesman)
B. it means my rooms will get done a lot quicker, my bathroom currently looks like a bomb has dropped in there :lol:
 

Reply to limestone bathroom in the Bathroom Tiling Advice area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

    • Like
Hi all, We had an outdoor limestone patio laid at the start of June (finished circa 07/06/24)...
Replies
3
Views
1K
We have just laid an outdoor patio and path using black limestone (now wishing I’d perhaps...
Replies
2
Views
2K
Hello, First post here on the forum. Thanks for reading! I have an application for 1"...
Replies
1
Views
1K
    • Like
Hi all, My 1st post and just wanting some help/reassurance on a DIY bathroom refurb. I’m...
Replies
4
Views
2K
    • Like
https://www.tilersforums.com/threads/shower-bath-tiling-preparation-plaster-and-wooden-windowsill...
Replies
1
Views
1K

Advertisement

Thread Information

Title
limestone bathroom
Prefix
N/A
Forum
Bathroom Tiling Advice
Start date
Last reply date
Replies
40
Unsolved
--

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 6.2%
  • Kerakoll

    Votes: 13 8.9%
  • Ardex

    Votes: 11 7.5%
  • Mapei

    Votes: 44 30.1%
  • Ultra Tile

    Votes: 17 11.6%
  • BAL

    Votes: 34 23.3%
  • Wedi

    Votes: 3 2.1%
  • Benfer

    Votes: 2 1.4%
  • Tilemaster

    Votes: 20 13.7%
  • Weber

    Votes: 18 12.3%
  • Other (any other brand not listed)

    Votes: 15 10.3%
  • Nicobond

    Votes: 7 4.8%
  • Norcros

    Votes: 3 2.1%
  • Kelmore

    Votes: 4 2.7%

Birthdays

Top