mattle40

Just wondering out of interest

Given your pretty much average upstairs bathroom
Say 1800mm sq
2 stud walls
2 stripped to brick (bath here)
T&g floor boards

How would you prep that room ready to tile
I.e wall & floor boarding

Just interested to see with so many tanking systems and over boarding products what would be the leading choices and methods

Also some might have seen my other thread regarding a plumber I sub to stuck in his ways, this would be handy to show him
Thanks
 
Last edited by a moderator:

Reply to Method statement in the UK Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

Hi Tilers, this is my first question on this forum and I've got a few different areas to cover...
Replies
0
Views
4K
F
Good evening all. I need to tile the kitchen floor over the bank holiday weekend. We are having...
Replies
21
Views
13K
Futuregrout
F
L
Right, I'm going to get shot down asking such a question. I'm doing 2 bathrooms in a house...
Replies
3
Views
10K
p4ulo
P
    • Like
Hi, Looking for some advice.... A returning client has came to me in a bit of a dilemma and...
2
Replies
17
Views
16K
lizzardtong
L
V
    • Like
Thought I'd put up a thread with regards to a wetroom I'm fitting in my house. Had some great...
Replies
36
Views
12K
lizzardtong
L

Trending UK Tiling Threads

UK Tiling Forum Popular

Advertisement

Thread Information

Title
Method statement
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
1

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 6.1%
  • Kerakoll

    Votes: 14 9.5%
  • Ardex

    Votes: 11 7.4%
  • Mapei

    Votes: 44 29.7%
  • Ultra Tile

    Votes: 17 11.5%
  • BAL

    Votes: 35 23.6%
  • Wedi

    Votes: 3 2.0%
  • Benfer

    Votes: 2 1.4%
  • Tilemaster

    Votes: 21 14.2%
  • Weber

    Votes: 18 12.2%
  • Other (any other brand not listed)

    Votes: 15 10.1%
  • Nicobond

    Votes: 7 4.7%
  • Norcros

    Votes: 3 2.0%
  • Kelmore

    Votes: 4 2.7%

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.

Top