Discuss Moving CU away from service head. SPD at the fused switch or DCU? Electrical Advice in the Electrical Advice area at TilersForums.com.

Moving CU away from service head. SPD at the fused switch or DCU? Discussion ThreadMoving CU away from service head. SPD at the fused switch or DCU? Electrical Advice

I'm moving my CU away from the service head. About 8m in 25mm2 SWA. Do I need to put an SPD T2 at the 100a fused switch I'm installing or can I get away with just having one at the new CU location? I'm struggling to find options for the service head location. They a lot more expensive and the box is bigger, smaller would work better for me. Also, most DBs now come with SPDs included. Any advice appreciated.

Moving CU away from service head. SPD at the fused switch or DCU? for the original thread on Electricians Forums
 

Reply to Moving CU away from service head. SPD at the fused switch or DCU? Electrical Advice in the Electrical Advice area at TilersForums.com

Subscribe to Tilers Forums

Advertisement

Thread starter

Lou

Staff member
Admin
Joined
Location
Staffordshire
Website
https://www.TilersForums.com
What member type are you?
  1. Support Rep (here to provide support only)
Business Name
TilersForums.com

Thread Information

Title
Moving CU away from service head. SPD at the fused switch or DCU? Electrical Advice
Prefix
N/A
Forum
Electrical Advice
Start date
Last reply date
Replies
0

Thread Tags

Tags
None

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.6%
  • Kerakoll

    Votes: 17 10.6%
  • Ardex

    Votes: 11 6.8%
  • Mapei

    Votes: 44 27.3%
  • Ultra Tile

    Votes: 21 13.0%
  • BAL

    Votes: 38 23.6%
  • Wedi

    Votes: 4 2.5%
  • Benfer

    Votes: 3 1.9%
  • Tilemaster

    Votes: 22 13.7%
  • Weber

    Votes: 19 11.8%
  • Other (any other brand not listed)

    Votes: 17 10.6%
  • Nicobond

    Votes: 8 5.0%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 3.1%
Top