dhsanta65
Potentially got a 42m2 floor to do hallway running into kitchen then into extension. Hallway and kitchen have a concrete base, extension is chipwood and sitting at a lower level so will over board to bring it up.
I assume I need some kind of moving joint were the two substrates meet, never used a moving joint before so was wondering about the setting out of the tiles, is it best to have a full tile either side of joint and if so how does this affect my setting out (if you know what I mean) ie for best cuts.
I assume I need some kind of moving joint were the two substrates meet, never used a moving joint before so was wondering about the setting out of the tiles, is it best to have a full tile either side of joint and if so how does this affect my setting out (if you know what I mean) ie for best cuts.