G
Graham100
Hi guys.
I have just patched an internal concrete floor about 50mm deep. 300mm x 300mm patches over visqueen so no absorbtion from beneath. It's an in use bathroom.
1. How long would you leave it to dry?
2. What sealer should I use?
Thanks in advance.
I have just patched an internal concrete floor about 50mm deep. 300mm x 300mm patches over visqueen so no absorbtion from beneath. It's an in use bathroom.
1. How long would you leave it to dry?
2. What sealer should I use?
Thanks in advance.