E

El Kabong!

Hi,

Great forum :)

I have only ever helped with tiling before.... 45x45 floor tiles.

I am now about to tile my ensuite.

I have 600x600 porcelain floor tiles. I think I will be OK with this.

I have matching 600x300 wall tiles and I am a bit worried.

From browsing topics I have more or less decided not to do a brick pattern, and to just lay in straight vertical lines.

However, I'm not sure about surface prep.

I had to strip the room down to nothing. I am just about to put the plasterboard back on the studs. It is green "water resistant" and not that thick really, but very very heavy. I am just using drywall nails to tap it in.


Will this be enough for 600x300 porcelain tiles????

The tile I am using was not overly cheap. It is the Atlas Concorde Glow the technical specs can be found here:
Broken Link Removed

Perhaps I should be using a different type of board, or different method of attaching it????

I have many many other questions but let's take things slowly....

Thanks.
 
Last edited by a moderator:
E

El Kabong!

Hi, OK so it is 12.5mm and I will get herself to pick up some screws today.

The stuff is 8*4 and is REALLY heavy. I cannot move an 8*4 by myself. I am a bit weedy but it is a large piece.

So, I have resorted to cutting them in half. I was going to them fix up the gaps. I know this is probably going to defeat the purpose of the waterproofing but if the horizontal join is above 4 foot high then I guess it will not matter too much, where it counts... in the shower area.

Any thoughts?
 
E

El Kabong!

Oh I will take my time don't worry about that!

This started off as a small shower leak. I resealed it but that didn't work. So I took up the floor covering (some wierd fake wood lino strips on MDF(!) and then I had to take the shower tray out and then all the tiles had to come down as the plasterboard was sodden. So I stripped the room.

I am doing all this myself and don't have a clue. I drained the rad system to remove the rad in the ensuite. I put service valves on the entry to the rad for this room and filled the system back up but I couldn't bleed most of my other rads as the bleed valves were worn down... so I replaced 16 rads around the house. But the rads I bought were 3cm longer or slightly shorter than the ones in there (rubbish yokes). So I had to sort the pipework at one end of each rad. Then, the rad support brackets were in different places so for alot of them I had to cut holes in the wall and put in new supports. Then my heating pump broke so I replaced that. Then I needed a new circuit board in the boiler.

So now that is all fixed I am back to the ensuite!!!!!
 
E

El Kabong!

Hi all,

I still haven't started this job as I am scared to make a mess of it and have had other projects to keep me busy.

But I think I am going to have to tackle it over the summer...

So I have a small upstairs ensuite, floor is about 3x2m. Quadrant shower tray, toiler, floating sink.

I cannot decide whether to do the walls or floor first.

It seems to me that I should do the floor first as I could tile under the shower tray and have a neat finish.
I would not enjoy having to cut tiles around a quadrant tray.

But my parents just had a company in doing theirs and they said do the walls first, and I can see that on here alot to.

Are the walls done first for the following reasons?

- so that when the floor tiles are laid up against the walls, the height of the adhesive+tile will cover any unevenness? But surely the opposite will be the same, you might see a funny edge cut on the floor tiles?

- because the shower tray has to go in due to waste access issues? My plan is to
1) place the shower tray in position
2) take up some flooring to give access
3) hand tighten the waste trap into position and hook up the outflow pipe to the existing pipe (within the ceiling space below)..
4) when I'm happy it is all in position, take away the tray. Make good the floor. Put down the WPB. Cut hole in ply for waste hole.
5) Tile the floor, cuting hole in one tile for waste hole
6) Fit the shower tray. I'm pretty sure I have a McAlpine top fit/thingy

Help!
 
This thread hasn't been replied to for 14 days, so replying to this one may not get a response. Post a new thread instead.

Reply to newbie, 600x300 wall tiling in ensuite in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

Hello All, I have a shower tray installed and it is sitting away from the wall. I am going to...
Replies
3
Views
656
I will be tiling with 60*30 procelain tiles. They weight about 3.57kg each which is about...
Replies
2
Views
590
Hi, I have a very small area (1m.sq) on an exterior doorway entrance wall to tile. I would...
Replies
8
Views
1K
    • Like
Hi, first time posting. I’m in the middle of tiling my own bathroom, first time having a go at...
Replies
8
Views
2K
Hi, i'm undertaking all of the tiling in our project. I have two different types of 600mm tiles...
Replies
1
Views
463

Trending UK Tiling Threads

UK Tiling Forum Popular

Advertisement

Tilers Forums on FB

...

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.

Top