H
hillhead
This morning we pull up at a new job to kick start it as the kitchen floor needed done today,the kitchen is being fitted on monday so i got a shock when i walked in,lol. cracks galore so i talked the customer into me getting ditra and covering the whole lot,45m2 !! we even had to grind the floor in places to get it more level ! no tiles down today and me not back till tuesday so kitchen man will be happy..:smilewinkgrin:
he wanted the floor all tiled before monday,lol.
he wanted the floor all tiled before monday,lol.